quantity required for cum of m grade concrete

Calculate Quantities of Materials for Concrete -Cement

Thus the actual volume of concrete for 1 cubic meter of compacted concrete construction will be = 1 -0.02 = 0.98 m 3. Thus, the quantity of cement required for 1 …

Learn More

How to Calculate Quantities of Cement, Sand and Aggregate for

The ratio of dry volume to the wet volume of concrete is 1.54. So 1.54 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete Volume of Cement required = 1/ (1+2+4) X 1.54 = 1/7 X 1.54 = 0.22 Cum Volume of Sand required = 2/7 X 1.54 = 0.44 Cum or 15.53 cft

Learn More

RATE ANALYSIS OF CONSTRUCTION ITEMS - Quantity Estimation

MACHINERY CONSUMPTION for Above Items Quantity ----- Sr.No. Machinery Code Machinery Description Qty Basic unit Rate Amount ----- 1. Concrete mixer Cost of Concrete mixer. All inclusive Hiring Charges 18.000 days 250.00 4500.00 2. Concrete Vibrator Cost of concrete vibrator.All

Learn More

Mix proportioning of M80 grade Self-Compacting Concrete based

Mix proportioning of M80 grade Self-Compacting Concrete based on Nan the amount of aggregates required is determined, content is limited to 450 kg per cum of concrete as per clause 8.2.4.2

Learn More

How to Calculate Steel Quantity Per Cubic Meter | Quantity of

In the special civil engineering article, it will be guided in what way to compute Steel quantity for each M³ for Lintel, Slab, Beam, Foundation and Column. Least/Minimum steel percentage is equal to 0.7 percent. Steel Quantity is equal to [0.7/100] x 1 is equal to 0.007 m 3 Steel Weight is equal to 0.007 x 7850 is equal to 54.95 ≊ 55 kg/m 3

Learn More

How To Calculate Cement, Sand & Aggregates Quantity in

Aug 03, 2018 · CALCULATION FOR AGGREGATE QUANTITY Consider volume of concrete = 1m3 Dry Volume of Concrete = 1 x 1.54 = 1.54 m3 Aggregate = (3/5.5) x 1.54 = 0.84 m3 ∴ 3 is a part of cement, 5.5 is sum of ratio

Learn More

Calculator - AfriSam

Total Volume. m³. AfriSam Surfacebed Mix. m³. Filling under surface bed (500mm deep allowed) m³. This option is supplied as readymixed concrete. For site mix calculations, refer to the concrete calculator. Please note: Wastage of 5% to be allowed. Foundations keyboard_arrow_right. Enter Height

Learn More

Maximum quantity of water needed per 50 kg of cement for

Maximum quantity of water needed per 50 kg of cement for M 15 grade of concrete is a) 28 liters b) 30 liters c) 32 liters d) 34 liters

Learn More

Rate Analysis Of Concrete - M25 Concrete Example Rate Analysis

Volume of Cement = 1/4 x 1.55 Volume of Sand = 1/4 x 1.55; Volume of Coarse Aggregate = 2/4 x 1.55; From the IS Code standard, Assuming the water-cement ratio for M20 is 0.5; The reason for that 1.55 has been already discussed in the concrete ingredients calculation topic. So the required Cement Volume - 0.3875 m3 or 11.16 Bags

Learn More

How much cement sand & aggregate required for M20 concrete

How much aggregate required for M20 concrete in cubic metre. step 10 :- calculate aggregate required for 1 cubic metre of M20 concrete in cubic metre is equal to 3/5.5 × 1.54 = 0.84 m3. Ans. :- 0.84 m3 quantity of aggregate is required for 1 cubic metre of M20 concrete.

Learn More

Quantities of Materials Per Cubic Meter of Concrete Mix

Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions varies with the mix design of the concrete and mortar respectively. Following table gives the estimated quantity of

Learn More

How to calculate quantity of cement ,sand & aggregate in 1m3

Total amount of water required = 30 x 403.2 / 50 = 241.92 litre. 8.064 bags of cement required for 1 cu.m of M20 grade concrete. 630 kg of Sand required for 1 cu.m of M20 grade concrete. 1260 kg of 20mm Aggregate is required for 1 cu.m of M20 grade concrete. 241.92 litre. of water is required for 1 cu.m of M20 grade concrete ←

Learn More

How To Calculate Of Cement, Sand And Aggregate For M10

Volume of concrete = 1 m³. Grade of concrete M20 (1:1.5:3) Find-out the Quantity of concrete (Wet volume and Dry volume) Wet volume of concrete = 1 m³. Dry volume = Wet volume x 1.54 (You can also take it as 1.50 to 1.55, But it became standard practice to considering 1.54 as multiplication factor). Dry volume of concrete = 1 x 1.54 =1.54 m³

Learn More

What is the quantity of cement required for 100 sq.m

thickness 4cm 0 04m volume of wet concrete is1 54 to1 57 ratio of mix1 2 4 volume 1 2 4 7 unit weight of cement bag is1440 kg cum one bag of cement 50 What is the quantity of cement required for 100 sq.m cement concrete (1:2:4) 4 cm thick floor?

Learn More

1m3 Concrete Quantity Calculation | 1m3 Concrete Ratio

Volume of dry Concrete = 1.54 to 1.57 times Volume of wet concrete. Also Read: Some useful tips to work out the quantity of cement, sand & aggregate in concrete. Here, 1.57 is taken as factor of safety Therefore, total concrete volume required is 1.57 m 3. Calculation of Volume of Cement in 1m 3 of Concrete:-The Quantity of Cement in Concrete

Learn More

Rate Analysis of PCC : (Plain Cement Concrete

In General Condition Lot of builders and Subcontractors are sublating this work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang Who can do it on PCC Rs. 6.00/ Sqft and Plum Concrete in 8.50 to 9.00 Rs. Per Cuft that is 300 Per Cum

Learn More

Concrete Mix Design: Illustrative Example M30 Grade (M20, M25

Concrete Mix Design Calculation : M20, M25, M30, M40 Grade Concrete Concrete mix design is a procedure of selecting the suitable ingredients of concrete and their relative proportions with an objective to prepare concrete of certain minimum strength, desired workability and durability as economically (value engineered) as possible.

Learn More

Concrete Mix Design for M10 grade | Civil4M

Dec 23, 2017 · Concrete mix Design for M10 Grade concrete with pure PPC cement only is as follows; PPC Cement 53 Grade – 220 Kg Water Cement ratio (w/c) – 0.6 Free Water – 132 liters 20mm Metal / Aggregates – 666 Kg 10mm Metal / Aggregates – 539 Kg Crush Sand – 1038 Kg Admixture Dosage – 0.6% Admixture – 1.32 Kg Density of Concrete – 2596 Kg/cum

Learn More

Concrete Mix Design Calculations (Pdf) | Concrete Mix Design

As, the quantity of concrete required for huge, constructions are huge, the economy in the quantity of materials such as cement makes the project construction economical. There different concrete mix design ratio used in the design. Concrete Mix design calculations for M25 grade of concrete can be calculated from the following steps:

Learn More

Rate Analysis of RCC (Reinforcement Cement Concrete

Dry Cement volume = 1.25 convert Wet cement.(The concrete mortar dry volume of concrete decrease volume of dry cement mortar, so 1.25 time of dry mortar) Wastage of cement mortar 30 % (1.25) extra So, Cement calculation requirement of cement = 1 x 1.25 x 1.30 = 1.625 cu.m,